OUR PROJECTS

PT. SILO MARITIME PERDANA
(TB. INA PERMATA SATU)

PT. SILO MARITIME PERDANA (TB. INA PERMATA SATU)

  • Troubleshooting azimuth thruster.
PT. Samudera Karya Mukti
(KN TRISULLA)

PT. Samudera Karya Mukti (KN TRISULLA)

  • AE Safety device test.
  • AE Synchronize troubleshooting.
PT. CINDARA PRATAMA LINES
(ROYAL RAY)

PT. CINDARA PRATAMA LINES (ROYAL RAY)

  • Troubleshooting CPP control.
  • Troubleshooting Engine speed control.
PT. HEXAGON MULTI ENERGI
(PLTMG SEMATANG BORANG)

PT. HEXAGON MULTI ENERGI (PLTMG SEMATANG BORANG)

  • Troubleshooting gas engine (W16V34SG).
PT. SAMUDRA KARYA MUKTI
(KN P-372)

PT. SAMUDRA KARYA MUKTI (KN P-372)

  • Installed ME STBD engine safety device.
  • Tested engine safety device.
PT. INDOBOILER

PT. INDOBOILER

  • PLC Programming (Siemens S7-1200).
  • HMI Programming (Siemens TP-400)
PT.HEKSAGON MULTI ENERGI
(PLTMG Sematang Borang)

PT.HEKSAGON MULTI ENERGI (PLTMG Sematang Borang)

  • High knocking gas engine troubleshooting.
  • Low pressure primming oil pump.
PT.PLN UPHK Medan
(PLTMG Duri)

PT.PLN UPHK Medan (PLTMG Duri)

  • Supporting PLN for Overhaul 48KH engine W18V50DF Unit#6 PLTMG Duri.
KPLP(Kantor Pangkalan Penjagaan Laut dan Pantai)
(K. Trisulla P-111)

KPLP (Kantor Pangkalan Penjagaan Laut dan Pantai K-Trisulla P-111)

  • Pengadaan 4 Unit PLC Panel Control.
  • Assembled PLC Panel (new).
  • Un-Installed latest PLC Panel.
  • Installed new PLC Panel, and Commissioning.
PT. INDOBOILER

PT. INDOBOILER

  • Troubleshooting pipe end forming machine.
  • Troubleshooting hydraulic solenoid valve.
AHTS ROYAL REY 7

AHTS ROYAL REY 7 Calibration Fuel Rack Sensor and Indicator CPP

  • Calibration fuel rack indications Port Site and Start Board Site Main Engine
  • Calibrations pitch lever ECS, BCS, ACS, CPP PS and STBD
  • Calibrations pitch indicator ECS, BCS, ACS, CPP PS, and STBD
KN. CERULIT P203

KN. CERULIT P203 Troubleshooting PLC Mesin Induk Kanan

  • Checking I/O module on STBD engine
  • Reprogram Left Main Machine PLC
  • Measuring range modules I/O
  • Replace Module I/O PLC PS Engine
  • Input Parameter Alarm System
PT. PRIMA SERVITAMA INDONESIA

PT. PRIMA SERVITAMA INDONESIA AHTS Triton Arjuna

  • Instrumentation and Control Main Engine.
  • Port Side and Start Board Side.
  • Configuration Relay Module (RM11a).
  • Install LDU and Configuration.
  • Install MoniTrend Software.
  • Troubleshooting.
PT.PLN UPHK Medan
(PLTMG Duri)

PT.PLN UPHK Medan (PLTMG Duri) Pemeliharaan rutin mesin jam kerja 48.000 Jam.

  • MAINTENANCE 48000 jam
  • Pre-Outage
  • Mechanical
  • Electrical
PT. IMP PLTMG KABIL-BATAM

PT. IMP PLTMG KABIL-BATAM SG32 SN – PAAE008728

  • Temuan CONNECTING ROD CYL A$ KONDISI BENGKOK.
  • Pembongkaran piston, cyl. Head, cyl. Liner untuk NDT.
  • Melakukan pengecekan crack.
  • Perakitan dan Pengukuran.